Renteca stud welding services provide options for customers wanting to complete stud welding works on site without the need to resource additional specialised, stud welding equipment.

Preferred choice by engineers and manufacturers, the stud welding process is impressively versatile, efficient, economical and produces high quality fusion welds. Renteca stud welding technology can attach threaded studs, plain studs, tapped studs, shear connectors, anchoring studs of diameter from 2-25 mm onto a work piece like sheet metal, pipes, profiles. Our capabilities include mobile stud welding.

Renteca also provides mobile stud welding including trucks and the additional power generation requirement on site. The additional diesel generator requirements can be overlooked when reviewing the equipment requirements in relation to stud welding on site.

Our commitment goes beyond providing a range of stud welder parts and stud welding machines. Renteca also prioritises delivering superior welding services and repair and maintenance support to our customers.

Our stud welding services are used in the following Sectors

Structural engineering

Structural engineering

Power Plants

Power Plants

Vehicle Construction

Vehicle Construction

Mechanical Engineering

Mechanical Engineering

Ship Building

Ship Building

Refractory attachment

Refractory attachment

Commercial Construction

Commercial Construction

Renteca Stud Welding Benefits

  • Quality control meets the requirements of AS1554.2.
  • Handover packages and testing in accordance with AS 1554.2 is provided at the end of each stud welding project including bend, ring and torque testing
  • Complete project solution including labour, materials and equipment

Play Video

Key Projects

Tomago Aluminium Homogenising furnace overhaul:

  • 4500off CF pins
  • complete overhaul of furnace’s 1,2 and 3

Alfabs Bridge Beam girders (Barnsley Weir Road Bridge):

  • 2028off M22*150 Shear connectors
  • Truck and generator required, all studs shot on site

Gonzalez Steel Randwick Campus Redevelopment:

  • 3800 off m19*120 shear connectors
  • 4 off parts through-deck and clean beam stud welding

Newcastle Yacht Club Expansion:

  • Laid 40Lineal Metres of Bondek plus 1140 M19*95 shear connectors
  • 3 Men laying bondek and edge form plus stud welding through deck

Corcoran’s MLC Building Expansion:

  • 2200off m19*95 shear connectors through deck
  • Around 100m of weld cable required to run up multiple levels inside a building

Westfield Kotara upper-level upgrade:

  • 8630off m19*100 shear connectors over multiple stories
  • Multiple story project consisting of laying bondek and stud welding